Industry Events
EnglishFrançaisEspañol中文العربية
活动新闻行业洞察主办方
服务
  • 活动营销向全球B2B受众发布、推广并拓展您的活动。
  • 新闻稿向全球行业专业人士分发官方公告。
  • 演讲者与专家推广展示您的专业知识,获得主旨演讲、专题讨论和大师班邀约。
订阅
演讲者登录免费发布您的活动
Industry Events

全球最值得信赖的B2B活动发现平台。将行业专业人士与重要的会议、展会和峰会连接起来。

  • Industry Events
  • 新闻
  • 活动主办方
  • 关于我们
  • 我们的服务
  • 高级主办方
  • Event Pro
  • 成为演讲者
  • 订阅
  • 使用条款
  • 隐私政策

© 2026 Industry Events Worldwide。保留所有权利。

VF100.0.
  • 活动
  • 新闻
  • 行业洞察
  • 账户
Industry Events
EnglishFrançaisEspañol中文العربية
活动新闻行业洞察主办方
服务
  • 活动营销向全球B2B受众发布、推广并拓展您的活动。
  • 新闻稿向全球行业专业人士分发官方公告。
  • 演讲者与专家推广展示您的专业知识,获得主旨演讲、专题讨论和大师班邀约。
订阅
演讲者登录免费发布您的活动
  1. 首页
  2. 新闻
  3. Data center construction spending surged in July

Axios

Data center construction spending surged in July

Data: U.S. Census Bureau, FactSet Construction spending on AI data center "shells" soared in July, rising at an annualized rate of nearly 60% from July 2025 levels. Why it matters: It shows the AI building frenzy was gathering strength this summer, even as — or perhaps because — a

A

作者 Axios

1 September 2026|1 分钟阅读
分享
Business & Leadership
Data center construction spending surged in July
Data center construction spending surged in July
分享
← 返回 IE News

有活动行业的新闻要分享吗?

提交新闻稿或信息,触达数千名活动行业专业人士。

联系我们→

更多Business & Leadership相关内容

  • African Business

    G-24 director: No organisation knows your economy better than you

    2 September 2026
  • Apple joins Google in renaming Lake Ontario to "Lake America"

    Axios

    Apple joins Google in renaming Lake Ontario to "Lake America"

    1 September 2026
  • What higher interest rates are telling us

    Axios

    What higher interest rates are telling us

    1 September 2026
  • House censures Chuck Edwards over "sexual harassment" of staff

    Axios

    House censures Chuck Edwards over "sexual harassment" of staff

    1 September 2026
  • Trump loses longshot bid to erase hush money conviction

    Axios

    Trump loses longshot bid to erase hush money conviction

    28 August 2026
  • U.S. officials defend deal with controversial Venezuelan oil baron

    Axios

    U.S. officials defend deal with controversial Venezuelan oil baron

    1 September 2026

相关洞察

  • Advanced manufacturing and industrial AI

    Rare Earth Elements: The Invisible Engine of Modern Life

    11 Aug 202610 min read
  • Smart agriculture and food technology

    The Future of Food: Vertical & Indoor Farming Is Becoming a Serious Growth Industry

    Vertical farming cuts water use 90%, grows food anywhere, anytime—and with costs plummeting, it’s both a climate lifeline and a trillion-dollar investment bet.

    2 Aug 202610 min read
  • Precision medicine and longevity

    AI Series: Predictive HealthCare

    Predictive and Preventive medicine is quietly rewiring how care works. Here's what's changing, what's real, and how to get ahead of it.

    28 Jul 202614 min read
Browse all insights →

相关活动

  • Project Finance & Project Financial Modelling - Oct 2026

    19 Oct 2025
  • ADIHEX 2026 (Abu Dhabi International Hunting and Equestrian Exhibition)

    28 Aug 2026
    Abu Dhabi, United Arab Emirates
  • Industrial Connect Expo

    31 Aug 2026
    India
  • Cinte Techtextil China 2026 (CTC26)

    1 Sept 2026
    China
浏览所有活动→

更多新闻中心内容

  • AI labs are facing an agent control problem

    AI labs are facing an agent control problem

    1 September 2026
  • China is secretly fueling America's data center rage

    China is secretly fueling America's data center rage

    28 August 2026
  • Africa brought deals to Washington - the test is whether the money moves.

    29 August 2026
  • U.S. strikes Iran tankers under new "tanker for tanker" policy

    U.S. strikes Iran tankers under new "tanker for tanker" policy

    2 September 2026
Industry Events

全球最值得信赖的B2B活动发现平台。将行业专业人士与重要的会议、展会和峰会连接起来。

  • Industry Events
  • 新闻
  • 活动主办方
  • 关于我们
  • 我们的服务
  • 高级主办方
  • Event Pro
  • 成为演讲者
  • 订阅
  • 使用条款
  • 隐私政策

© 2026 Industry Events Worldwide。保留所有权利。

VF100.0.